Patient Bay - Renal Dialysis, Chair
PBTR-RD-A
Revision:
5.0
Date published:
27/04/2021
The Patient Bay - Renal Dialysis is for patients receiving haemodialysis therapy.
Treatments for each patient may take from 3 to 6 hours, occurring up to 3 days per week. A staff handwashing basin will be provided for each 4 bays and the Patient Bay will have, wherever possible, clear line of sight to a staff station. Access to natural light and views is required. Furniture and furnishings should provide a high level of patient comfort and amenity.
Room Data Sheet
Downloads
Room Layout Sheet
Downloads
Related Documents
Archive
Find past versions of documents here
Downloads
Treatment Bay - Renal Dialysis, Type A
Revision:
2.0
23/05/2005
Treatment Bay - Renal Dialysis
Revision:
2.0
23/05/2005
Retired Standard Components
Retired Standard Components